Going solar is exciting — but what actually happens after you sign the contract? Here’s a quick look at the typical solar installation process.
1. Site Survey
An installer visits your home to inspect your roof, measure sun exposure, and design the right system for your property.
2. Permitting
Your solar company handles permits with your local government. This step can take anywhere from a few days to a few weeks depending on your area.
3. Installation Day
The actual install usually takes 1–2 days. Installers mount the panels, run wiring, and connect everything to your electrical system.
4. Inspection
Your local building department (and sometimes your utility) will inspect the system to ensure it’s up to code and safe to operate.
5. Permission to Operate
Once approved, you get the green light to flip the switch and start generating clean energy!
From start to finish, the full process typically takes 4–8 weeks. Best Solar Companies Near Me only lists installers with smooth, transparent timelines.