Best Solar Companies Near Me
← Back to Blog

What to Expect During the Solar Panel Installation Process

3/30/2025

Going solar is exciting — but what actually happens after you sign the contract? Here’s a quick look at the typical solar installation process.

1. Site Survey

An installer visits your home to inspect your roof, measure sun exposure, and design the right system for your property.

2. Permitting

Your solar company handles permits with your local government. This step can take anywhere from a few days to a few weeks depending on your area.

3. Installation Day

The actual install usually takes 1–2 days. Installers mount the panels, run wiring, and connect everything to your electrical system.

4. Inspection

Your local building department (and sometimes your utility) will inspect the system to ensure it’s up to code and safe to operate.

5. Permission to Operate

Once approved, you get the green light to flip the switch and start generating clean energy!

From start to finish, the full process typically takes 4–8 weeks. Best Solar Companies Near Me only lists installers with smooth, transparent timelines.

Get Connected Now

Skip the research and phone calls. We connect you with the best solar company for your needs.

By clicking Submit, you agree that Best Solar Companies Near Me, its affiliates, or associated third parties may contact you via emails, calls or texts, including via automated means. You also agree to our Terms of Use and Privacy Policy.